Village Of Sackets Harbor
 Minutes 

January 24, 2017: 2017 01-24 Village Board of Trustees Minutes Final

Table Of Contents:
Body:

Village of Sackets Harbor Board of Trustees

January 24, 2017

Special Meeting

112 N. Broad St.

Sackets Harbor, NY 13685

 

 

Present: Mayor Vincent Battista, Deputy Mayor Barbara Boulton, Trustee Molly Reilly, Trustee James Bray. Also present: Village Engineer Kris Dimmick, Heritage Area Director David Altieri, DPW Superintendent Lonny Reinhardt, and Treasurer Jim Yuhas.  Absent: Trustee Daniel Frechette.

 

The Meeting was called to order at 6:00 pm with the Pledge of Allegiance.

 

David Altieri presented the information he had on the Market Square Park grants. There are two grants, one for $50,000 for the Park Boundary Line, the pavers on both sides of W. Main St. and grading. The second one is for $268,000 for the sidewalk from the Public Dock to General Smith Drive, the boat Launch repair and the picnic area. These are both matching grants where the Village provides one half of the project. He will meet with the State representative to find out what can be used as the local share for the projects.

 

Kris Dimmick reviewed the options for the repair or replacement of the water tower on Co Rt 75. The cost to replace it is estimated to be 1.5 million. If it were repaired for approximately $600,000 its life expectancy would be about 20 more years. In a motion made by Mayor Battista, seconded by Trustee Reilly, it was decided to move forward on the repairs and put it out to bid. Vote 4 ayes (Battista, Boulton, Reilly and Bray), 0 nays.

He also reviewed the Preliminary Engineering Report for the Water Intake Improvements and went over the possible changes to the plan. Superintendent Reinhardt suggested placing the new 18” intake pipe parallel to the old pipe and tying them together to utilize the rest of the existing system. Kris Dimmick said they need to do a survey and some other preliminary work, and will do some more research on marine contractors to get a better idea on cost and feasibility.

 

A motion to adjourn the meeting was made by Mayor Battista and seconded by Trustee Reilly at 7:54 pm. Vote 4 ayes (Battista, Boulton, Reilly and Bray), 0 nays.

 

 

 

 

Minutes submitted by

 

 

Peggy Kelly

Village Clerk